The Label Creation Station

Monday 1st March LinkedIn Post

We recently visited our manufacturing client, after they had their label creation station installed on their factory floor, and we were lucky to see the 3.90m x 2.10m Worcester Range GRP Kiosk in action. The Problem The noise of the large machinery on the shop floor was becoming difficult for production operatives to process labels […]